You are here

Assar
Architects

News

Aile 1000

Located at the heart of Brabant Wallon, the Saint Pierre hospital is constantly evolving, which recently entailed an expansion consisting of new wings to accommodate the emergency, endoscopy and gynaecology departments.

Ensor & Delvaux

In mid-October 2015, the second phase of the Ensor & Delvaux project, located in Woluwe-Saint-Lambert, began its provisional acceptance processes.

30 years of Assar Architects
30 years of Assar Architects

ASSAR, now ASSAR ARCHITECTS, celebrated its 30 years of existence this past Thursday, October 8, at the Chirec Delta worksite in Auderghem.

LAVOISIER RESIDENTIAL
LAVOISIER RESIDENTIAL

Located in Molenbeek, this 1930s industrial building has been converted into a multifunctional building consisting of productivity areas and a living space.

HIS IZZ

Enclosed within a block, surrounded by a large number of individual houses and residential buildings, Ixelles hospital has evolved despite this constraint.

W34
W34

Located along the Boulevard de la Woluwe in Brussels, W34 was delivered for acceptance in May. This project is a conversion of an office building built in the ’70s on 8 floors, into a residential building of 7137 m² surface area. Only the building structure has been preserved.

Veridis
Veridis

The head office of the international insurance brokerage company Marsh & McLennan in Brussels, the Veridis building was inaugurated in March 2015.

NOVALIS BUSINESS CENTRE

Located in the economic region of Marche-en-Famenne, the Novalis Business Center was completed at the end of August 2014.

On 27th November, ASSAR ARCHTECTS inaugurated its branch in Liège : L’ATELIER ARCHITECTS.

The 15th “Journée Construction Acier” (steel construction day) took place on 27th November in Zaventem and was a great success, with no fewer than 500 participants.

Pages

Clearfix